6UDD2W6S1A2 Enclosure Kit for 0.020"/0.5mm PCB (size 0.5625"x0.5625") 2 SMA Active 0.58" Height
SKU: 90912452050

6UDD2W6S1A2 Enclosure Kit for 0.020"/0.5mm PCB (size 0.5625"x0.5625") 2 SMA Active 0.58" Height

Sale price$95.40 Regular price$106.00
Save 10%

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Jul 7 - Jul 12

Promo Codes Available:

For Your Every Summer RSVP, with Code: SUMMER15

Description

6UDD2W6S1A2 Enclosure Kit for 0.020"/0.5mm PCB (size 0.5625"x0.5625") 2 SMA Active 0.58" HeightRF Designer Kit is for RF prototyping with PCB size of the Rogers PCB (RO4350 or FR4) 9 16"x9 16"x0. 020"(or 0. 5mm). Part Number: 6UDD2W6S1A2. RF Housing Size: 5Ux5U (15 16"x15 16"). Each U is 3 16". Housing height: 0. 58". The PCB mounting hole spacing is 0. 375" and 0. 375" respectively. PCB Inside Clearance to Enclosure Cover is 0. 26". (e. g., LNA, Frequency Conversion Circuits etc.). SKU#: AK20_003MN. Proudly Made in USA by Lotus Communication

RF Designer Kit is for RF prototyping with PCB size of the Rogers PCB (RO4350 or FR4) 9/16"x9/16"x0.020"(or 0.5mm). Part Number: 6UDD2W6S1A2.

RF Housing Size: 5Ux5U (15/16"x15/16"). Each U is 3/16". Housing height: 0.58". The PCB mounting hole spacing is 0.375" and 0.375" respectively. PCB Inside Clearance to Enclosure Cover is 0.26". (e.g., LNA, Frequency Conversion Circuits etc.). SKU#: AK20_003MN.

Proudly Made in USA by Lotus Communication Systems, INC. in Weston, Massachusetts.

RF Kit include (PCB is not included):

  • All CNC Machined Housing and Cover, 1 ea
  • SMA 2-Hole Flange Jack Receptacle Connector, 0.086", 0.012" Pin, 2 ea
  • EMI Feedthrough Cap #4-40, 100V/10A, 1ea
  • Ground Solder Terminal #4-40, 1 ea
  • 2-56x3/16 SHCS, 4 for SMA Connector
  • 2-56x5/32 SHCS, 4 for PCB
  • 2-56x3/16 Flat Head Screw (for Cover), 4 ea

Features

  • Hold PCB Size 9/16"x9/16"x0.020" (or 0.5mm)
  • Clearance from PCB top to Enclosure Cover (0.26")
  • All CNC Machined Surface for Superior Finish and Minimize RF Leakage
  • 4 Installation Holes to Mount Kit to Back Board with #2 SHCS
  • 3/16" Wall Thickness for Strong Mechanical Strength
  • Two SMA Connectors
  • Electroless Nickel Plating per MIL-C-26074, ASTMB 733
  • Professional Zebra Ultimate Label for Outdoor Usage
  • Proudly MADE IN USA (Material & Labor)
  • ROHS Compliant

Applications

  • Cell
  • Microwave Radio
  • Test Instrumentation
  • SDR & Ham Radio

Resources

6UDD2W6S1A2 Datasheet
Shipping Notes
  • Free Standard Shipping on $100+ Orders to the USA.
  • Except Preorder products are shipped in 48 hours.
  • Delivery to the USA:
  1. Standard Shipping : 3-10 business days
  • If time is of the essence, please consider selecting expedited delivery for faster service.
Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy
SKU: 90912452050

Discover Niche Categories That Outsell

Top-Converting Item to Boost Your Average Order

4.6 ★★★★★
Based on 1195 reviews
Sort
Highest Rating
Newest First
Oldest First
Product Reviews
A
Verified Purchase
Advanced Marine Technology
Lexington, US
★★★★★ 5
VEPURLT Alighnment Tool
Great quality and shipped very quickly
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on May 26, 2026
M
mike
Cuba, US
★★★★★ 5
Helpful Tool Kit for MerCruiser Maintenance
This tool kit made servicing the gimbal bearing and checking engine alignment much easier than improvising with generic tools. The machining looks solid and the tools fit properly with MerCruiser components. Helpful set for anyone doing their own marine maintenance work. Definitely useful to have around for sterndrive service jobs.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on May 15, 2026
J
Jo Bo
Dallas, US
★★★★★ 5
Saves So Much Time, Perfect Fit On Mercruiser Pre-Alpha Outdrive.
This is a very useful kit. Perfect fit to exchange and align the gimbal bearing on a Mercruiser MR/Pre-Alpha Outdrive. The metal rods are strong and well machined to fit the gimbal bearing and the template lines up great with the housing studs. The overall production quality is very good. Great value because the tools are very durable but for me the biggest value is the time saved. I had the bearing out in about 10 minutes. The ability to line up the bearing before attempting to attach the outdrive upper gear unit is very convenient and saves so much time. This are simple tools, very easy to use.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on May 1, 2026
R
Rick
Carnegie, US
★★★★★ 5
Easy to use
Works great
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on May 9, 2026
S
Verified Purchase
Steve M.
Houston, US
★★★★★ 5
Works well. You need to drill a 3/8” hole
Appears to be well made, alignment bar slides in nicely. As stated, you need to drill a hole in the bar for the gimble bearing driver, the directions are not clear, what I did was before I take out the old gimble bearing, put an O ring on the bar close to the last step on the bar, slide the bar all the way in, then carefully slide the bar out, this marks the distance from the back of the gimble bearing to where the shaft on the outdrive bottoms out, move the O ring a 1/4” towards the stepped part of the alignment tool (this is so you won’t bottom out the alignment tool when driving the gimble bearing in) then slide the driver puck up to the O ring and use a 3/8” diameter transfer punch through the side hole in the puck to mark the bar. You need to drill a 3/8” diameter hole in the alignment bar, two V blocks, some clamps, and a drill press will make drilling much easier, after the bar is securely mounted and centered in the drill press, use a center drill, then 1/4” drill first, using plenty of oil, drill all the way through, then use the 3/8” drill, deburr both sides and you should be good to go. People complain that it doesn’t come pre-drilled, the reason is that not all out drives are the same so you have to fit it to the outdrive that you have. Fortunately, I have a machine shop at my house and have a jig setup with various drill bushings, but the method I described above should work for you. Just make sure you’re perfectly centered and secure before you start drilling.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on April 16, 2026

recommand products